Overflow N’giriama Sill Ihefu Swamp MENU Almost Zero Flow VDAS Idunda overflow Expected drying of Ruaha River at Park HQ with drying supply from the Ihefu Swamp, expected soon. Decline Overflow Ihefu after announcement Alert 3, October 2024 Compare reduced flow in Ruaha at Idunda Virtual Drainage Assessment Station (VDAS) of October 2, 2024 withContinue reading “Overflow N’giriama Sill Ihefu”
Category Archives: Flow Ng’iriama Sill
Overflow from N’giriama returns
Overflow N’giriama June 20, 2023
Overflow N’giriama Early June 2023 Some 2.5km downstream of the Ihefu Swamp N’giriama Sill several channels over the base rock are still feasible early June 2023.
Flow Ruaha at Park HQ recovering
Surface overflow advancing to Park HQ The surface flow in the Ruaha River between N’giriama and Msembe (Park HQ) slowly advances. On January 8, 2023 there is still a section of the river 21.3km upstream of the Msembe Bridge with zero flow from the Ihefu Swamp while water supplied from local cachments already flows underContinue reading “Flow Ruaha at Park HQ recovering”