
The Kapunga and Ifushiro Wetlands on December 31, 1985. The Chinese Mbarali Farms are constructed (white perimeter right) and the Natural Drainage system (blue) is still functional. Scale in upper left.
The Kapunga and Ifushiro Wetlands on December 31, 1985. The Chinese Mbarali Farms are constructed (white perimeter right) and the Natural Drainage system (blue) is still functional. Scale in upper left.